BioWare | Success Story
"Since using Electric Cloud's solution, every month has yielded a record low number of breaks. Because there are so few broken builds, the developers are able to really focus on what happened in a particular instance and fix it so that the next time the build goes even more smoothly."
"Since using Electric Cloud's solution, every month has yielded a record low number of breaks. Because there are so few broken builds, the developers are able to really focus on what happened in a particular instance and fix it so that the next time the build goes even more smoothly."
CERN | Success Story
"Electric Cloud ElectricCommander is highly flexible, allowing us to adapt it any way we need it. We don't need to mold our software process to the product, as it can actually match our existing approach to software development."
"Electric Cloud ElectricCommander is highly flexible, allowing us to adapt it any way we need it. We don't need to mold our software process to the product, as it can actually match our existing approach to software development."
Equinix | Success Story
"Our smart development cloud has also increased visibility and transparency throughout the development process, and allowed our team to better collaborate and more fully align to reach our common goals as one integrated team."
"Our smart development cloud has also increased visibility and transparency throughout the development process, and allowed our team to better collaborate and more fully align to reach our common goals as one integrated team."
FamilySearch | Success Story
"In the past we released products in one to three months; now we can go from commit to production every 10 minutes. Automation is a key part of making that happen."
"In the past we released products in one to three months; now we can go from commit to production every 10 minutes. Automation is a key part of making that happen."
Force10 | Success Story
"Everyone, including our CEO, recognized that improving build speed was key to getting our products out on time."
"We estimate a minimum savings of 200 engineer hours per week with Electric Cloud."
"Everyone, including our CEO, recognized that improving build speed was key to getting our products out on time."
"We estimate a minimum savings of 200 engineer hours per week with Electric Cloud."
Intuit | Success Story
"With Electric Cloud, the SCM team has gone from being viewed as a bottleneck to a solution provider to the rest of the organization."
"A broken build caused a half day of lost engineering productivity because it could take until 1 P.M. the next day to resolve. With Electric Cloud, broken builds are a thing of the past."
"With Electric Cloud, the SCM team has gone from being viewed as a bottleneck to a solution provider to the rest of the organization."
"A broken build caused a half day of lost engineering productivity because it could take until 1 P.M. the next day to resolve. With Electric Cloud, broken builds are a thing of the past."
LSI Logic | Success Story
"In the morning, our builds are more predictable, and they're more accurate. That's because the testing is done at the same time and there are fewer mistakes. Electric Cloud has made my job easier."
"In the morning, our builds are more predictable, and they're more accurate. That's because the testing is done at the same time and there are fewer mistakes. Electric Cloud has made my job easier."
Mercury Computer Systems, Inc. | Success Story
"Since we've been using ElectricAccelerator, our build times have been reduced by more than 75%, and in the six months we've been using it, we haven't had even one ElectricAccelerator related build failure."
"Since we've been using ElectricAccelerator, our build times have been reduced by more than 75%, and in the six months we've been using it, we haven't had even one ElectricAccelerator related build failure."
Netezza | Success Story
"We shortlisted ElectricCommander because it topped the critical features-and-functions comparison list created by our development team. But our final decision became obvious when ElectricCommander outperformed the alternative on several key metrics in a head-to-head test."
"We shortlisted ElectricCommander because it topped the critical features-and-functions comparison list created by our development team. But our final decision became obvious when ElectricCommander outperformed the alternative on several key metrics in a head-to-head test."
Perforce | Success Story
"We looked at building our own solution, but, by one estimate, it would have taken us as long as two years and $2.5 million to match ElectricCommander's functionality."
"We looked at building our own solution, but, by one estimate, it would have taken us as long as two years and $2.5 million to match ElectricCommander's functionality."
Qualcomm | Success Story
"Even if we assume that each engineer does only one build per week, the money saved in lost productivity pays for the system inside of 6 months."
"Software builds used to be so frustrating that I had to leave the building. Now I can actually wait for my builds to complete."
"Even if we assume that each engineer does only one build per week, the money saved in lost productivity pays for the system inside of 6 months."
"Software builds used to be so frustrating that I had to leave the building. Now I can actually wait for my builds to complete."




