Electric Cloud
Customer Success
Overview
 
Customer Success

BioWareBioWare | Success Story
"Since using Electric Cloud's solution, every month has yielded a record low number of breaks. Because there are so few broken builds, the developers are able to really focus on what happened in a particular instance and fix it so that the next time the build goes even more smoothly."


Force10Force10 | Success Story
"Everyone, including our CEO, recognized that improving build speed was key to getting our products out on time."

"We estimate a minimum savings of 200 engineer hours per week with Electric Cloud."


IntuitIntuit | Success Story
"With Electric Cloud, the SCM team has gone from being viewed as a bottleneck to a solution provider to the rest of the organization."

"A broken build caused a half day of lost engineering productivity because it could take until 1 P.M. the next day to resolve. With Electric Cloud, broken builds are a thing of the past."


Get Flash Player

LSI LogicLSI Logic | Success Story
"In the morning, our builds are more predictable, and they're more accurate. That's because the testing is done at the same time and there are fewer mistakes. Electric Cloud has made my job easier."


Mercury Computer Systems, Inc.Mercury Computer Systems, Inc. | Success Story
"Since we've been using ElectricAccelerator, our build times have been reduced by more than 75%, and in the six months we've been using it, we haven't had even one ElectricAccelerator related build failure."


QualcommQualcomm | Success Story
"Even if we assume that each engineer does only one build per week, the money saved in lost productivity pays for the system inside of 6 months."

"Software builds used to be so frustrating that I had to leave the building. Now I can actually wait for my builds to complete."

© 2003 - 2008 Electric Cloud. All rights reserved.  Site Map | Privacy | Terms of Use